JSS 55555 SPECIFICATIONS IN DETAIL EPUB DOWNLOAD

RELATED SPECIFICATIONS Joint Services Specifications JSS Revision No. In such cases the details shall be as given in the relevant. 16 Jul For more details, refer Procedure 6, Test Condition K, Page no of Refer Test No, Page no of Defence Standard JSS Product should meet all environmental Specification as per JSS , Revision No 2, Year , Clause L-2B. The following Test is carried out on product.

Author: Vudobei Tulrajas
Country: Mozambique
Language: English (Spanish)
Genre: Video
Published (Last): 26 June 2010
Pages: 260
PDF File Size: 1.11 Mb
ePub File Size: 13.61 Mb
ISBN: 668-5-29751-848-2
Downloads: 27875
Price: Free* [*Free Regsitration Required]
Uploader: Kehn

JSS 55555 – Antifungal Test – Electronics

The nozzles can be easily removed for revalidating the pressure. The centre of the test bed have a water channel with a MS grated covering. Powder coated MS super structure is used for long life. A closed loop water circulation system consists of industrial grade pumps jss 55555 specifications in detail the discharge of water.

The width of the super structure can be adjusted and one side of the structure can be moved on guided wheels. The control panel consist of all the electrical switchgears and operating instruments needed for a smooth operation of the Driving rain test facility. The operation of these zones is as per the requirement of JSS Zones The Driving rain test facility is divided into multiple zones.

TOP Related Articles  IACOBUS MATILDE ASENSI DOWNLOAD

All the nozzles are mounted jss 55555 specifications in detail the header pipes which in turn is connected to the main header pipe. The Driving rain test facility is divided into multiple zones. The super structure is built using GI frames with anti-corrosive coating and profiles to support the pipelines. The main control station is provided in the control room. Description Detaik Area No. Test Space Test Bed: Overview Features Technical Specifications.

Environmental and Mechanical Test Facility | SEONICS

The Driving rain test facility is made of Brick wall up to 1 meter height on two sides with special foundation. Reinforced concrete test bed with a Degrees gradient towards setail and load bearing capacity of up to 1 to 1. The twin shower area with 1.

Header Pipes All the nozzles are mounted on the header pipes which in turn is connected to detwil main header pipe. Water Recirculation System Jes closed loop water circulation system consists of industrial grade pumps for the jss 55555 specifications in detail of water. Each main header pipe will have pressure gauges along with strainer to protect the nozzle blocks from dust particles. The sprayed water is recirculated through a water channel, passing through a filtration system and returns to the main water sump.

TOP Related Articles  CRANK AND SLOTTED LEVER QUICK RETURN MECHANISM PDF DOWNLOAD

Features Super Structure The super structure is built using GI frames with anti-corrosive coating and profiles to support the pipelines.

Control Station The main control station is provided in the control room.

The control station consists of a stand-alone IP55 protected control cum operating panel. JanuaryOur Booth No.