13 Tháng Chín Download:: 2. nh mc d ton xy dng cng trnh – Phn Xy dng cng b km theo vn bn s /BXD-VP ca B Xy dng Download:. – nh mc /BXD-VP. 28 Tháng Mười Vn bn s /BXD-VP ngy 16/8/ ca B Xy dng cng b nh mc d ton xydng cng trnh – Phn Xy dng. – Vn bn s 21/SXD-KTXD ngy 09/01/ ca S. Decision No//QD-BXD dated on 29 September issued by MOC Norm No//BXD-VP dated on 16 August issued by MOC.

Author: Kagashakar Kajidal
Country: Bolivia
Language: English (Spanish)
Genre: Marketing
Published (Last): 24 July 2017
Pages: 274
PDF File Size: 13.40 Mb
ePub File Size: 6.80 Mb
ISBN: 745-9-56553-502-3
Downloads: 99316
Price: Free* [*Free Regsitration Required]
Uploader: Mezijind

Boulders that exceed the above stated volume and cannot be pulverized without the use of pneumatic tools, drilling and blasting operations, or by standard tractor or backhoe, shall be classified as Hard Rock. Soft rock shall comprise weathered bxe, sandstone, limestone and such materials which, in the opinion of the Engineer, can be excavated by picking, ripping or other similar means without resorting to blasting.

Tong Hop Dinh Muc Du Toan XDCT

This plan shall be continuously updated, in weekly basis, in accordance with the progress of the works until completion of the roadway excavation. Duc asks for advice on how to proceed the above case? No materials shall be wasted without previous bsd by the Contractor and respective approval by the Engineer.

Designed and developed by Vietkent. Roadway excavation classified as hard rock shall include only such roadway excavation that in the opinion of the Engineer is not practicable without the use of pneumatic tools or drilling and blasting operations. The material shall be measured in the original position in the natural ground after Site Clearing and Grubbing. The topsoil shall be completely removed to the required depth from any designated area prior to the beginning of regular excavation or embankment work in the area and shall be kept separate from other excavated materials for later use.

After approving the project design, construction drawing, cost estimates, the investor organized bidding to sellect the construction contractor. The Activity Value shall be measured as the ratio: Payment for such compaction shall deem to be included in the unit rate for excavation. This soil class includes all the types of soil excavation by hand and by equipment described in the Tables of Soil Classification applying for soil excavation, transportation, filling 11776 by hand and machine in the Norm of Cost Estimation for Construction enclosed with the Document No.

Surplus material to the amount required for the construction of the embankment, provided however that it is not material rendered surplus by reason of the Contractor having opened borrow bxr solely for his own convenience. Materials below the natural ground surface in embankment areas and in excavation areas below the grading plane or other limits shown on the Drawings, or as designated by the Engineer, that is unsuitable for the planned use.

TOP Related Articles  NO ME HAGAS PENSAR STEVE KRUG PDF

Measurement of boulders will taken as the maximum dimension along the longest axis of the boulder length multiplied by?

Tong Hop Dinh Muc Du Toan XDCT

Waste areas shall be left in a smooth, neat and drainable condition, as required by the Engineer, and all waste material shall be placed in such manner that adjacent property will not be damaged or endangered.

Nguyen Minh Duc Nam Dinh asks on some issues related to adjusting cost estimates, finalization of state budget project contracts signed in the form of adjustable unit price-based contract. Bzd on finalization of adjustable unit price-based contract. If it becomes necessary for the Contractor to locate or relocate any waste areas, the Contractor shall obtain previously the approval from the Engineer to commence with the operation for spreading any waste.

The actual excavation volume shall be computed from the average cross section areas bounded by the ground lines after clearing and grubbing, the designed slope lines, and plane after excavation of unsuitable material.

However, the project still used some norms per Official Letter No. The material to v; disposed as unsuitable material shall not be wasted until approved or directed in writing by the Engineer.

Keynote TCVN in Revit

Hard rock shall not include material which, in the opinion of the Engineer, can be loosened or excavated with standard equipment tractors bbxd backhoe. Wed, 07 Jun However, boulders that although exceeding the above stated volume can be disposed out of the Project area by using common equipment for transportation without necessity of blasting or pulverization shall not be considered as rock excavation.

No allowance will be made for classification of different types of material or soil encountered. No payment will be made for the excavation from unapproved design changes. The payment and finalization of construction contracts shall be done per the content of the contracts signed between parties and following state regulations applicable to contracts.

Boulders that are less than the stated volume shall be measured as soil excavation.

Whether or not the authorized agencies handled it correctly? The contract form is adjustable unit price-based, specifying that the contract price can be adjusted when there are changes in regimes, policies by the Government and material price, or when there are changes in construction price indices announced by state agencies.

Variation, delays or failing on this condition and the application of countermeasures to correct respective defects will be evaluated by the Engineer in accordance with the statements of the Conditions of Contract and will be charged to the Contractor expenses without any time extension.

Finished excavated surfaces that are exposed to surface run-off water shall be sufficiently smooth and uniform, and have sufficient slope, to ensure the free drainage of the surface with no ponding. Soil that cannot be properly compacted in accordance to Specification requirements or as determined by the Engineer. If in the adjustable unit price-based contract there is a clause specifying that the contract price can be adjusted when there are changes in regimes, policies by the Government and material price, or when there are changes in construction price indices announced by state agencies, the adjustment of contract price per norms announced by the Ministry of Construction is acceptable.

TOP Related Articles  BOTEX DC 2448 PDF

The quantity of Common Excavation to be paid for shall be the number of cubic meters of material acceptably excavated in accordance with this specification and approved by the Engineer, based on field measurements.

All excavations shall be finished to reasonably smooth and uniform surfaces.

If in the adjustable unit price-based contract does not exist a clause specifying that the contract price can be adjusted when there are changes in regimes, policies by the Government and material price, or when there are changes in construction price indices announced by State bodies, the adjustment of contract price per norms announced by the Ministry of Construction is not acceptable. The quantity of Unsuitable Material, vpp according to this Specification section and approved by the Engineer, shall be measured in cubic meter.

The removed topsoil shall be transported and deposited with the height not in excess of 3m to avoid disturb to natural ground in storage piles at locations previously prepared by the Contractor and approved by the Engineer.

This rock class includes the type of rock grade 4 described in the Table of Rock Classification applying for gxd excavation in the Norm of Cost Estimation for Construction enclosed with the Document No. Excavation operations shall be conducted so that material outside of the limits of slopes will not be disturbed. The measurement shall include unavoidable over-breakage due to slides when not attributable to carelessness of the Contractor. The waste areas poposed by the Contractor shall be permitted by the relevant state bxf local authorities and shall ensure all requirements of environmental control and protection pv specified in the Section of the General Specification.

Boulders shall comprise solid pieces of rock that are weathered on all faces boulders that are between 0. Unsuitable material shall be removed and disposed of in waste areas provided by the Contractor in such manner as to present a neat appearance and not to obstruct drainage to any highway nor to cause injury to highway works or property.

The vxd adjustment per the signed contract is consistent with regulations applicable to construction contracts.

This rock class includes the types of rock from grade 1 to grade 3 described in the Table of Rock Classification applying for rock excavation in the Norm of Cost Estimation for Construction enclosed with the Document No. Soil Excavation will be in a single unit price for cp regardless of the soil nature, existing conditions or geological classification.